A mutually agreed upon list by owner and contractor scheduling work to be completed after owner acceptance of the home as complete, and owners final payment
A list prepared by the architect, designer and owner and formally submitted to the contractor to note any deficiencies when the check all completed construction, which assures verification that such work has been accomplished in a good, workmanlike manner in respect to the contract documents
An itemized list, typically prepared by the architect or construction manager, documenting incomplete or unsatisfactory items after the contractor has notified the owner that the tenant space is substantially complete
An itemized list noting incomplete or unsatisfactory construction Usually prepared by the tenant architect after the contractor has notified the owner that the tenant space is substantially complete
A discrepancy list showing defects in construction which need some corrective work to bring the building up to standards set by the plans and specifications
An inspection list created after substantial completion of the contract, and comprised of defective or incomplete work The list is signed and the job is complete when a final inspection confirms that all work has been completed satisfactorily according to the contract
The list of sophisticated wiretapping function that the FBI wants common carriers to provide under the 1994 digital wiretap law, but which the carriers say is too costly and may exceed the law's scope The FCC has been asked to decide whether the industry's standard is sufficient (See Issues Section)
A list prepared by the responsible architect/engineer, construction manager, or CPMG staff members that identifies items that must be completed by the contractor or Department of Facilities Management before substantial completion is accepted
A list of incomplete or unacceptable construction items that upon remedy and completion will usually complete the obligations of the contractor under a construction contract (top)
A list of unsatisfactory or incomplete work items that are identified by the Construction Manager during an inspection of the work The contractor must complete all punch list work items satisfactorily before the home will receive final acceptance