Определение planning horizon в Английский Язык Английский Язык словарь
the total timespan covered by a firm's marketing plans; the length of the planning horizon is commonly determined by the degree of uncertainty in the environment
(Ticaret) The length of time into the future planning systems generate requirements and messages. The horizon should be at least as far out as the single longest cumulative lead time for any item in the system
In an MRP system, the planning horizon is the span of time from the current to some future date for which material plans are generated This must cover at least the cumulative purchasing and manufacturing lead time, and usually is quite a bit longer
The overall period considered in the planning process that spans all activities covered in the analysis or plan, and all future conditions and effects of proposed actions which would influence the planning decisions For timber resource planning purposes, the overall time period extends far enough into the future to assure that the allowable sale quantity can be achieved and maintained at the long-term sustained yield capacity It is the last year of the planning period (fixed by the planner), the length of the planning period that will be considered in the planning process For example, one 1995 plan had a "planning horizon" of 2025 AD
The length of time into the future planning systems generate requirements and messages The horizon should be at least as far out as the single longest cumulative lead time for any item in the system