Определение planned order в Английский Язык Английский Язык словарь
(Ticaret) A suggested production, purchase or replenishment order generated by an MRP or other planning system to meet a projected shortage against desired safety stock levels. The shortage date becomes the due date, the release date is backward scheduled based on lead time, and the quantity is based on the specified lot size. Planned orders for upper level items create requirements for lower level components, and MRP generations delete existing planned orders and regenerate new ones based on changes in requirements. Planned orders must be firmed or accepted before releasing to production or to a vendor
(Ticaret) The date required to firm, or release, a planned order based on the specified lead time until the planned receipt date. Many systems allow the selection and review of planned orders based on specifying a release date time frame
(Ticaret) (FPO) A manufacturing order that reserves capacity and allocates material but, unlike a work order, has not been authorized for release to the production floor. MRP planned orders are automatically changed by the system at each regeneration; FPOs are manually controlled by the planner and are normally either turned into actual work orders, or cancelled. A tool for what-if capacity analysis, and also sometimes used to allocate known components on a bill of material that is not complete and requires finalization before releasing to production orders for the floor