eksik ya da tamamlanmamış işler listesi

listen to the pronunciation of eksik ya da tamamlanmamış işler listesi
Турецкий язык - Английский Язык
(Mukavele) punch list
A list of discrepancies in building plans or other construction flaws written by the original architect during his final inspection of the structure
A mutually agreed upon list by owner and contractor scheduling work to be completed after owner acceptance of the home as complete, and owner’s final payment
A list compiled by a buyer prior to a sale detailing items to be fixed before closing
A list prepared by the architect, designer and owner and formally submitted to the contractor to note any deficiencies when the check all completed construction, which assures verification that such work has been accomplished in a good, workmanlike manner in respect to the contract documents
Items that need to be completed and/or fixed once the contractor indicates the work is finished
A list of flaws in the construction of property that must be corrected by the seller An example of such a flaw is a leaky roof
A list, compiled by a buyer on a final walk-through, detailing items to be fixed before closing
An itemized list, typically prepared by the architect or construction manager, documenting incomplete or unsatisfactory items after the contractor has notified the owner that the tenant space is substantially complete
Prepared by the architect upon substantial completion of construction to indicate remaining construction items to be resolved
A list of minor items to be completed by the builder of a newly constructed building after the closing
An itemized list noting incomplete or unsatisfactory construction Usually prepared by the tenant architect after the contractor has notified the owner that the tenant space is substantially complete
A list buyers make of property defects that need to be fixed before closing
Orderly list of open job items prepared for review when you take occupancy of facility
A list of discrepancies that need to be corrected by the contractor
A discrepancy list showing defects in construction which need some corrective work to bring the building up to standards set by the plans and specifications
list of undone tasks (especially left undone after a major project)
Buyers compile a punch list during the final walk-through detailing items to be fixed before closing
A written list of items which need to be fixed, repaired or replaced prior to the final walk-through
An inspection list created after substantial completion of the contract, and comprised of defective or incomplete work The list is signed and the job is complete when a final inspection confirms that all work has been completed satisfactorily according to the contract
A list showing what items or work needs to be done to complete the work stated in the contract Usually compiled near the end of a job