Определение engineering change order в Английский Язык Английский Язык словарь
(Ticaret) (ECO) A formal document that has been signed off by the affected departments and authorizes product definition changes to a drawing, bill of material or routing. It often ties to system planning, scheduling and cost functions by specifying an effectivity date for the items included