punch lists

listen to the pronunciation of punch lists
İngilizce - Türkçe

punch lists teriminin İngilizce Türkçe sözlükte anlamı

punch list
(İnşaat) eksikler tutanağı listesi
punch list
(Mukavele) eksik ya da tamamlanmamış işler listesi
İngilizce - İngilizce
plural form of punch list
punch list
The list of repairs and finish work required to complete a large project, such as the construction of a building; a list of problems to correct

The building opened on schedule, but it took them another three months to get through the punch list.

punch list
A list of discrepancies in building plans or other construction flaws written by the original architect during his final inspection of the structure
punch list
A mutually agreed upon list by owner and contractor scheduling work to be completed after owner acceptance of the home as complete, and owner’s final payment
punch list
A list compiled by a buyer prior to a sale detailing items to be fixed before closing
punch list
A list prepared by the architect, designer and owner and formally submitted to the contractor to note any deficiencies when the check all completed construction, which assures verification that such work has been accomplished in a good, workmanlike manner in respect to the contract documents
punch list
Items that need to be completed and/or fixed once the contractor indicates the work is finished
punch list
A list of flaws in the construction of property that must be corrected by the seller An example of such a flaw is a leaky roof
punch list
A list, compiled by a buyer on a final walk-through, detailing items to be fixed before closing
punch list
An itemized list, typically prepared by the architect or construction manager, documenting incomplete or unsatisfactory items after the contractor has notified the owner that the tenant space is substantially complete
punch list
Prepared by the architect upon substantial completion of construction to indicate remaining construction items to be resolved
punch list
A list of minor items to be completed by the builder of a newly constructed building after the closing
punch list
An itemized list noting incomplete or unsatisfactory construction Usually prepared by the tenant architect after the contractor has notified the owner that the tenant space is substantially complete
punch list
A list buyers make of property defects that need to be fixed before closing
punch list
Orderly list of open job items prepared for review when you take occupancy of facility
punch list
A list of discrepancies that need to be corrected by the contractor
punch list
A discrepancy list showing defects in construction which need some corrective work to bring the building up to standards set by the plans and specifications
punch list
list of undone tasks (especially left undone after a major project)
punch list
Buyers compile a punch list during the final walk-through detailing items to be fixed before closing
punch list
A written list of items which need to be fixed, repaired or replaced prior to the final walk-through
punch list
An inspection list created after substantial completion of the contract, and comprised of defective or incomplete work The list is signed and the job is complete when a final inspection confirms that all work has been completed satisfactorily according to the contract
punch list
A list showing what items or work needs to be done to complete the work stated in the contract Usually compiled near the end of a job
punch list
The list of sophisticated wiretapping function that the FBI wants common carriers to provide under the 1994 digital wiretap law, but which the carriers say is too costly and may exceed the law's scope The FCC has been asked to decide whether the industry's standard is sufficient (See Issues Section)
punch list
A list prepared by the responsible architect/engineer, construction manager, or CPMG staff members that identifies items that must be completed by the contractor or Department of Facilities Management before substantial completion is accepted
punch list
A list of incomplete or unacceptable construction items that upon remedy and completion will usually complete the obligations of the contractor under a construction contract (top)
punch list
A list of unsatisfactory or incomplete work items that are identified by the Construction Manager during an inspection of the work The contractor must complete all punch list work items satisfactorily before the home will receive final acceptance
punch lists