master production scheduling

listen to the pronunciation of master production scheduling
İngilizce - Türkçe
ana üretim çizelgeleme
master production schedule
Ana üretim çizelgesi
İngilizce - İngilizce

master production scheduling teriminin İngilizce İngilizce sözlükte anlamı

master production schedule
A master production schedule (MPS) is a plan for individual commodities to produce in each time period such as production, staffing, inventory, etc
master production schedule
a document that defines the goods that specific shops will produce in definite quantities at definite times over a short term planning horizon
master production schedule
Abbreviation: MPS A realistic, detailed, manufacturing plan for which all possible demands upon the manufacturing facilities (such as available personnel, working hours, (management) policy and goals) have been considered and are visualized The MPS is a statement of what the company expects to produce and purchase expressed in selected items, specific quantities and dates
master production schedule
shows the quantity and timing of planned production
master production schedule
(Ticaret) (MPS) The schedule of manufactured items usually created to fill 'outside' demand from forecasts, customer orders and interplant orders that specifies the exact item numbers, dates and quantities for production but is not in itself a production order to be released to the floor. It considers the high-level production plan and rough cut capacity availability, and aligns with management targets for linearity and permissible level of changes. Once accepted, the MPS specifies the date and quantity requirements used by MRP to explode demand through the bill of materials. While most often for end items, variations of MPS allow planning critical lower levels such as major subassemblies based on a forecast that is then consumed by customer orders for finished goods that require those subassemblies. The MPS is the main driver for the rest of the planning and scheduling system, and the level of success in attaining a realistic MPS often indicates how well the other detailed parts of the system function
master production schedule
-The schedule that determines which products a manufacturer produces in which volumes at which dates
master scheduling
(Ticaret) The process of reviewing a proposed MPS, comparing to stated higher-level production plan, resource availability and management parameters, and firming it and releasing to the rest of the system. The frequency of regenerating and reviewing the MPS, typically weekly, depends on the industry, process flexibility, forecast accuracy and many other factors
master production scheduling

    Heceleme

    mas·ter pro·duc·tion scheduling

    Türkçe nasıl söylenir

    mästır prōdʌkşın skeculîng

    Telaffuz

    /ˈmastər prōˈdəksʜən ˈskeʤo͞oləɴɢ/ /ˈmæstɜr proʊˈdʌkʃən ˈskɛʤuːlɪŋ/