rough-cut

listen to the pronunciation of rough-cut
English - English
{s} cut into small coarse pieces, unrefined; lacking manners or refinement; lacking delicacy
of stone or timber; shaped roughly without finishing
{i} film that has not yet been fully edited
lacking refinement or cultivation or taste; "he had coarse manners but a first-rate mind"; "behavior that branded him as common"; "an untutored and uncouth human being"; "an uncouth soldier--a real tough guy"; "appealing to the vulgar taste for violence"; "the vulgar display of the newly rich"
A preliminary arrangement of film or tape shots that are roughly edited together without voice-over or music to serve purpose in the early stages of editing
The horizontal measurement from the face of one riser to the face of the next riser This is also the depth of the tread without the nosing
the preliminary edited version of the workprint See also fine cut
An EDMing operation with high metal removal rates at rougher finishes
an early version of the edit
the first print of a movie before after preliminary editing
Preliminary edit of raw footage to establish tentative sequence, length approximate sequence and content of the eventual video program
Lumber that has not been dressed (surfaced) but which as been sawn, edged, and trimmed to at least show saw marks in the wood on the four longitudinal surfaces of each piece for its overall length
A cut taken on a drum or rotor for the purpose of removing large amounts of material without concern for resulting surface finish This cut is taken at the highest possible feed rate A rough cut is always followed by a finish cut
rough cut capacity planning
(Ticaret) (RCCP) A high-level capacity planning system often developed at the family level that provides an overall check of critical resources and verifies the feasibility of the master production schedule and sales and operations plan. It uses a bill of resource for items or families that specifies the requirements for key resources only, as opposed to all operations as done on the routing. Resource requirements from the S&OP and suggested MPS are compared to availability, on an overall weekly or monthly basis, and indicate projected over and under capacity situations that could impact the successful completion of the plan
rough-cut
Favorites