(Ticaret) (engineering change order) A formal document that has been signed off by the affected departments and authorizes product definition changes to a drawing, bill of material or routing. It often ties to system planning, scheduling and cost functions by specifying an effectivity date for the items included
The IMRF Elected County Official Plan This plan provides for an alternative benefit plan for Elected County Officials In order for an elected county official to participate in this plan, his or her county must first adopt the program
Engineering Change Order (ECO) is used for changes in documents such as processes and work instructions It may also be used for changes in specifications Also referred to as ECN
A CHIPS feature used to make minor and valid changes to a netlist Requires clustering the new netlist to look like the original one, placement of all components as in the old floorplan, and resolving the hierarchical location and floorplan placement of new instances not part of the original netlist