- this process can only be done with tapered tip product and will weaken the overall flex of the shaft by a sub-flex It is accomplished by taking the 2 iron shaft and placing it in the 3 iron head and continuing this trend throughout the set By doing this, you will increase the length to 1st step measurement by 1/2"