engineering change order

listen to the pronunciation of engineering change order
Englisch - Türkisch

Definition von engineering change order im Englisch Türkisch wörterbuch

eco
(önek) Çevreci; çevreye zarar vermeyen
eco
(entry clearance officer) Giriş temizleme memuru
Englisch - Englisch
(Ticaret) (ECO) A formal document that has been signed off by the affected departments and authorizes product definition changes to a drawing, bill of material or routing. It often ties to system planning, scheduling and cost functions by specifying an effectivity date for the items included
eco
eco-
engineering change order

    Silbentrennung

    en·gi·neer·ing change or·der

    Türkische aussprache

    encınîrîng çeync ôrdır

    Aussprache

    /ˈenʤəˈnərəɴɢ ˈʧānʤ ˈôrdər/ /ˈɛnʤəˈnɪrɪŋ ˈʧeɪnʤ ˈɔːrdɜr/
Favoriten