تعريف multilevel bill of material في الإنجليزية الإنجليزية القاموس.
(Ticaret) A bill of material that contains multiple successive levels, with the top level typically coded as level 0, its immediate components as level 1, and so on. It can be used to track all requirements and costs involved in producing a parent item down to the lowest-level purchased parts
An ordered list of the parts, sub-assemblies, and assemblies and raw materials that define a product Normally created and maintained within the Project Structure Management function, it defines the type, number, quantity, and relationships of parts and assemblies
A listing of all the subassemblies, parts and raw materials that go into the parent assembly It shows the quantity of each raw material required to make the assembly There are a variety of display formats for BOMS, including single level, indented, modular/ planning, transient, matrix and costed BOMs [APICs, CMSG]
Lists materials (components or ingredients) required to produce an item Multilevel BOMs also show subassemblies and their components Other information such as scrap factors may also be included in the BOM for use in materials planning and costing
(Ticaret) (BOM) A structured list of the items used in making a parent assembly that reflects the actual production process in terms of timing and quantities consumed. It is constructed in conjunction with the routing, which describes the individual production steps and rates used. A BOM may optionally include information relating to backflushing, use of alternate and optional components, tie between components and the operations that use them, and other data. BOMs are used by the MRP function to calculate component requirements when given a parent demand, and in building product costs. (Syn: product structure, recipe, formulation, ingredients list)
A structured list of the items used in making a parent assembly that reflects the actual production process in terms of timing and quantities consumed It is constructed in conjunction with the routing, which describes the individual production steps and rates used A BOM may optionally include information relating to backflushing, use of alternate and optional components, tie between components and the operations that use them, and other data BOMs are used by the MRP function to calculate component requirements when given a parent demand, and in building product costs (Syn: product structure, recipe, formulation, ingredients list)